Maintenance

 

The Evaluation stage is over and the system is running smoothly. However as time passes, it will no doubt need to be looked after.

This is the Maintenance phase of the Systems Life Cycle.

At this stage the following takes place:

bullet

Problems are cleared as they arise

bullet

Tweaks to the system are applied to improve performance

bullet

New circumstances might arise such as an office move.  The system has to be moved.

bullet

Data is backed up and kept safe.

bullet

Printers, Monitors and other equipment are replaced as required.

This phase never really ends until the Life Cycle of the system is complete i.e. the system is switched off for the last time and a replacement system is introduced.

 

In summary the System Life Cycle consists of:

bullet

Definition of the problem

bullet

Feasibility Study

bullet

Investigation and Analysis

bullet

Design

bullet

Development (programming)

bullet

Testing

bullet

Implementation

bullet

Evaluation

bullet

Maintenance

As you may now realise, the System Life Cycle model has been developed to make it more likely that projects are completed as planned, within budget and on time.  However, even with this rigorous process, there are no guarantees that a project will succeed.

 